-
NFC-83
-
NFC-82
-
NFC-81
-
NFC-83A
-
NFC-82M
-
NFC-62M
-
NFC-63
-
NFC-62
-
NFC-61
-
NFC-63A
-
NFC-61STT
-
NFS-61-5CM
-
FACTOR 600
-
FACTOR 600T
-
NFC-42
-
NFLCR-53
-
NFLCR-51
-
IWLCR-66v2
-
IWS-210
-
IWS-10
-
ICSUB-8
-
Skybar Bracket
-
Skybar Satellite
-
Skybar LCR
-
NFW-63
-
NFW-62
-
NFW-61
-
DA-1260
-
DA-2.1
-
SUBAMP-500
-
VITRU4
-
OS-62T
-
OS-82T
-
RLPS-6T
-
ROS-8T
-
ROS-6T
-
RLPS-5T
-
VAIL Cast Documents
- VAIL Cast Quick Start Guide
- VAIL Cast Owner's Manual
- VAIL Cast Specifications
- VAIL Cast TROUBLESHOOTING FAQ
- VAIL Cast Connecting to Wifi using iPhone or Android Phone
- VAIL Cast Web Interface Use
- VAIL Cast Network & Apple Home Setup
- VAIL Cast Apartment & Hotel Users
- VAIL Cast Multi-Amp Selection, Pairing, and Setup
- VAIL Cast Tips for Integrators
- CAD Diagrams
-
VAIL Cast Additional Resources
-
VAIL Cast Videos
-
Legacy Products
Skybar Pre-Construction Bracket Owner’s Manual
Download PDF Manual>>>
PDF Manual Library>>> | PDF Specifications Library>>> | PDF CAD Library>>>
ASSEMBLY INSTRUCTIONS
1. Before installing Skybar Pre-Construction Brackets, carefully plan the locations of the speakers accounting for potential electrical, plumbing, and other fixtures.
2. Route speaker cable from source to this location.
3. Lay L-bracket on a flat surface parallel to each other with screw holes flat on the surface.
4. Make sure the L-bracket edges are adjacent to each other facing inward to speaker opening.
5. Place sliding rails on top of the L-brackets while lining up screw holes.
6. Screw all four joints with provided screws.
7. Use wood screws to mount Pre-Construction Bracket onto ceiling joists or wall studs with the L-bracket edge facing the room.
8. Before tightening wood screws, slide Pre-construction bracket to the desired location and tighten.
SBPCB-12-2022